The public comment period on the draft language runs through Monday, May 5.
Specifically, two code sections require updates:
- 40.385 Stormwater and Erosion Control – Provides protection of water quality through the application of best management practices for stormwater management and erosion control to development and redevelopment projects.
- 13.26A Water Quality – Provides minimum requirements for controlling the discharge of contaminants and stormwater flows to county storm drains, streams and groundwater.
Comment forms and more information related to the updates can be found at www.clark.wa.gov/stormwater.